Pmp (R) / Capm (R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method - Jayanta K. Das Purkayastha - Livros - Booklocker Inc.,US - 9781614345046 - 31 de outubro de 2011
Caso a capa e o título não sejam correspondentes, considere o título como correto

Pmp (R) / Capm (R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method 1st edition

Jayanta K. Das Purkayastha

Preço
Íkr 3.089
excluindo impostos

Item sob encomenda (no estoque do fornecedor)

Espera-se estar pronto para envio 17 - 24 de jul
Adicione à sua lista de desejos do iMusic

Pmp (R) / Capm (R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method 1st edition

A thorough and in-depth preparation guide for PMP® and CAPM® exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.


118 pages, black & white illustrations

Mídia Livros     Paperback Book   (Livro de capa flexível e brochura)
Lançado 31 de outubro de 2011
ISBN13 9781614345046
Editoras Booklocker Inc.,US
Páginas 118
Dimensões 178 × 256 × 11 mm   ·   217 g
Idioma English