Network Scheduling Techniques for Construction Project Management - Nonconvex Optimization and Its Applications - M. Hajdu - Livros - Springer - 9780792343097 - 31 de dezembro de 1996
Caso a capa e o título não sejam correspondentes, considere o título como correto

Network Scheduling Techniques for Construction Project Management - Nonconvex Optimization and Its Applications 1997 edition

M. Hajdu

Preço
$ 156,99
excluindo impostos

Item sob encomenda (no estoque do fornecedor)

Espera-se estar pronto para envio 30 de jun - 4 de jul
Adicione à sua lista de desejos do iMusic

Também disponível como:

Network Scheduling Techniques for Construction Project Management - Nonconvex Optimization and Its Applications 1997 edition

Industrial, financial, commercial or any kinds of project have at least one common feature: the better organized they are, the higher the profit or the lower the cost. Project management is the principle of planning different projects and keeping them on track within time, cost and resource constraints.


335 pages, biography

Mídia Livros     Hardcover Book   (Livro com lombada e capa dura)
Lançado 31 de dezembro de 1996
ISBN13 9780792343097
Editoras Springer
Páginas 335
Dimensões 156 × 234 × 20 mm   ·   725 g
Idioma English